This is my Blog about my various mostly gaming related hobbies. Here is where I brag about my conquests and try to explain that it was the dice fault that I lost. I will try to share my knowledge and sometimes even give a review or a walkthrough. And I give a warning, I have mild dyslexia and English is not my native tong so there will be faults but think of it as funny quirks.
2013-01-19
2013-01-14
2013 week 2 house update
So many many many weeks have past since my last post about the
house. Shame on me!
But I am back
writing again and it is a new glorious year a head off us. I have
no intentions to build on house the hole year, I want to
be finished soon because we are getting fatigued of the
build. So I am very glad to write that the finial inspection of the build is
book in the final weeks of January and hopefully can we
move in after that if every thing proceeds as planed.
You how have keep
track of the calendar understand that it is only a few weeks left
until the house should be finished! But there have been good progress at the
site and the contractors have been working even on the Sunday
before Christmas eve.
All the flooring
are done on the upper floor and the it is only the kitchen and a small area
on the lower floor that is not done because of lack of material. We have chosen
a standard oak parquet for the most of the house it will complement
the white walls and give a nice natural look. But in the entrance hall and the
kitchen have chosen a more fresh linoleum interlocking tiles in lime
green and anthracite grey ordered in a chess board pattern.
It will give allot of colour to the house and act as an
area divider in the otherwise very open space.
All the floor boards for the lower floor |
The tilers
have also been working. The upper and lower floor bathroom is done and it
looks really good. We are very pleased with the choice of tiles, it
make the bathroom seam bigger. Also our contractor have done a very good job
with the tiling. No are we only waiting on the furniture and taps to have them
done. It will be nice to have two bathrooms and two showers in the morning.
As the tilers have
been working with the walls in the bathroom have the painters been plastering
and painting all the walls and sealing. So nearly all the painting is done and
it looks good! We are very happy that we had contractors for this work because
of the shear amount of work they have put in to this house is immense. Because
we have gypsum sealing is there allot more work and all the window embrasure
are with out window trim. And it is hard to beat
a professional painter with it comes to work speed and end result.
It not that long until we can move in and et feels like to two reaming weeks will be very hectic. The carpenters needs to do all the final touches and build a small wall towards the staircase. This wall needs to be plastered and painted. The electrical needs to make all the final wiring and install allot of lights. The kitchen needs to be mounted in place...... you understand the list is long and it is only 9 work days left.